Rail-traction rectification and distribution equipment, with a recent Beijing metro procurement record.

Discuss your project

Beijing Huatai is the Wolong-associated transformer enterprise named in Beijing's public procurement records. Its most specific sourcing context is urban-rail power equipment: traction rectification, dry-type amorphous-core distribution transformers and railway power-transformer projects. Wolong's own history records the Beijing Huatai acquisition in April 2009. A July 2026 Beijing metro procurement notice provides a more recent, separately dated reference for the legal entity and the rail-equipment packages it put forward.

Chinese contracting entity
卧龙电气集团北京华泰变压器有限公司
Credit code
91110114600001728T
Sourcing context
Rail traction rectification and auxiliary distribution
Group milestone
April 2009 acquisition/reorganisation
Recent procurement stage
First-ranked candidate; Beijing Line 1 branch, July 2026
01

Identify the Beijing enterprise

The Beijing public-resource platform names 卧龙电气集团北京华泰变压器有限公司 and records unified social credit code 91110114600001728T. Its supplier entry was published on 22 October 2024. Matching that Chinese legal name is useful when a buyer encounters different English translations of Beijing Huatai or older names in a historical reference.

This page uses the official Wolong group mark for brand recognition. The group's broader motor and drive businesses are separate from the Beijing transformer's sourcing scope. A request addressed to this enterprise should identify the transformer or rectification equipment and the contracting entity, rather than rely on the breadth of the group brand.

References: [1]

02

The 2009 milestone explains the business route

Wolong's official corporate history records an April 2009 acquisition and reorganisation involving Beijing Huatai. It describes the expansion of its transmission-and-distribution range into urban-rail transformers and complete power-rectification equipment. That is a dated explanation of how the Beijing operation entered the group history.

For a buyer, the important practical distinction is between a railway power transformer, an urban-rail traction rectification package and an auxiliary distribution transformer. They serve different loads and interfaces. The group-history entry establishes that these routes were discussed as business categories; it does not supply the ratings or test guarantees of a present quotation.

  1. April 2009

    Beijing Huatai acquisition/reorganisation

    Wolong official history records the urban-rail transformer and power-rectification route.

References: [2]

03

Read the 2026 metro reference at the correct stage

Beijing's public-resource platform published a candidate notice on 6 July 2026 for the Line 1 branch traction power-distribution equipment procurement. It names Beijing Huatai as the first-ranked candidate after evaluation on 3 July. This is a procurement-stage reference, not a commissioning record or a statement that the equipment has been delivered.

The same notice lists prior experience entries involving the Changping south extension, Beijing Lines 12 and 17, and the Jinhua–Yiwu–Dongyang regional rail project. These entries help identify the kinds of packages relevant to a rail buyer. The public notice does not provide the unit-by-unit loss schedules, drawings or factory acceptance reports for a new order.

References: [3]

04

Specify traction and auxiliary loads separately

A traction rectifier transformer is selected as part of a converter supply arrangement. The inquiry needs the intended rectification scheme, voltage relationship, load cycle and interfaces with the rectifier and protection equipment. Stating only a kVA value would leave the essential system arrangement undefined.

An auxiliary distribution transformer has a different brief: the AC distribution voltage, continuous duty, station environment and required loss performance. The procurement references mention dry-type amorphous-core distribution equipment, but that description should be attached to the auxiliary scope rather than assumed to describe every traction unit in a combined package.

For a tender covering both, separate the equipment schedule into distinct line items. Identify which supplier scope includes the rectifier, temperature controls, enclosure, monitoring and connecting conductors. This is an engineering recommendation for preparing the inquiry; it is not a claim that every option is included in Beijing Huatai's standard supply.

05

Agree the interface and test documents before comparing offers

Rail-power purchasing normally involves interfaces with switchgear, supervisory systems and the station layout. Send the single-line diagram, available short-circuit information, required operating sequence and physical installation envelope. Define the primary supply and the intended output arrangement so the supplier can respond to the same system boundary as competing bidders.

For each proposed transformer, request a data sheet stating continuous rating, voltage combination, frequency, winding material, impedance and loss guarantees at their reference temperatures. A package-level description of traction equipment is insufficient for a life-cycle cost comparison. If the inquiry concerns amorphous-core auxiliary distribution equipment, keep its no-load loss evaluation separate from traction-duty performance.

Request the proposed test schedule, general-arrangement drawings, terminal interface drawing and list of documents delivered with each serial-numbered unit. Define which tests will be witnessed and how the complete equipment package will be accepted. These details allow the procurement record to serve as a starting point for a substantive discussion, instead of as a substitute for technical acceptance.

06

Build a rail-project inquiry the enterprise can answer

Begin with the project type and the package boundary: traction rectification, auxiliary distribution or a combined station procurement. Attach the load schedule and electrical drawings, then provide station-room dimensions, ventilation assumptions, installation access and environmental conditions. Describe any existing equipment that the new package must replace or connect to.

Ask for a proposal broken down by equipment item, with the agreed interface responsibilities, performance guarantees, drawing milestones and test-document delivery. Where a past rail reference is relevant, request a comparable reference with the same equipment role and duty. A project name alone does not establish that its electrical arrangement matches the new installation.

Use the platform inquiry to keep the requirements and replies together. The meaningful comparison is between the actual proposed transformer and rectification packages, with their technical conditions and documented scope, rather than between group-wide promotional claims.

A project brief the factory can respond to

Use this list to prepare your requirements. Checking an item only marks your preparation on this page.

0 of 6 items prepared

Prepare an RFQ for WOLONG

Questions buyers ask

Which entity should I name in a procurement brief?

Use 卧龙电气集团北京华泰变压器有限公司, credit code 91110114600001728T, and confirm the current contracting details in the supplier's commercial documents.

Does the July 2026 notice prove delivery to the Line 1 branch?

No. It is a first-ranked candidate notice. Delivery and commissioning require their own later records.

Should I combine traction and auxiliary transformer requirements?

Keep their electrical requirements and performance guarantees as separate line items, even if the commercial inquiry covers one station package.

Does the Wolong logo imply the whole group's manufacturing scope applies here?

No. It identifies the associated brand. This profile focuses on the Beijing entity's transformer and rail-power sourcing context.

Sources

3 sources · checked 8 October 2026

Prepared by PowerTransformerB2B. Checked 8 October 2026. The sources below identify the published company information and any dated public records used for this profile.

Company catalogues describe product families and options. Before you order, ask the manufacturer for the type-test report and acceptance documents for your exact model and rating.

  1. [1] Beijing supplier entity entry, 22 October 2024Beijing Public Resource Trading Service Platform · Government entity record
  2. [2] Wolong official corporate milestones: April 2009Wolong · Corporate original
  3. [3] Line 1 branch traction power-distribution candidate notice, 6 July 2026Beijing Public Resource Trading Service Platform · Government procurement notice