MANUFACTURER PROFILE

Nanjing Liye Power Transformer Co., Ltd.

Main power-transformer tiers, mobile and industrial references, with an operations-and-repair service route.

Discuss your project

Nanjing Liye Power Transformer Co., Ltd. (南京立业电力变压器有限公司) builds power transformers at No. 1 Huqiao Road, Jiangbei New Area, Nanjing. It dates its transformer business to 1970 and has belonged to Shenzhen Liye Group since a 2004 acquisition. Its catalogue is divided into 35, 110, 220, 330 and 500 kV categories plus special transformers, each illustrated with named project units such as ODFS22-334000/500 and OSFPSZ18-360000/330. Its company history lists the third-party tests behind several of those designs, and it also offers operation, maintenance and repair.

Chinese entity
南京立业电力变压器有限公司
Published factory address
No. 1 Huqiao Road, Jiangbei New Area, Nanjing (江苏省南京市江北新区虎桥路1号)
Group
Shenzhen Liye Group (深圳市立业集团); acquired 2004
Published scale
210,000 m² site; 700+ staff, 200+ technical
Voltage categories
35/110/220/330/500 kV; special transformers
Laboratory claim
CNAS-accredited since 2021; all tests except short-circuit
01

The Nanjing factory history is distinct from the group

Liye's company introduction dates the transformer business to 1970 and records its acquisition/reorganisation by Shenzhen Liye Group in 2004. It separately describes the group's founding in 1995. These dates refer to different organisations and milestones; they should not be collapsed into one incorporation date for the transformer manufacturer.

For a contract, use 南京立业电力变压器有限公司 and match the manufacturer/contracting entity on the quotation, drawing and acceptance records. The factory address on the company site provides a location reference, while the supplier's current commercial documents should establish the actual order and delivery details.

  1. 1970

    Transformer-business history

    Manufacturer-described origin.

  2. 2004

    Acquisition/reorganisation

    Company introduction names Shenzhen Liye Group.

References: [1]

02

Reference units by voltage class, as Liye names them

Scroll sideways to compare all columns.

Published designationVoltage categoryProject label as published
ODFS22-334000/500500 kVListed without project label
OSFPSZ18-360000/330330 kVGansu Guodian Canghai substation
SFZ20-300000/220220 kVEnvision Fengning wind, storage and hydrogen demonstration project
SFSZ20-240000/220220 kVEnvision Ordos zero-carbon industrial park
SFSZ20-150000/220220 kVDesheng Steel
SF20-190000/110110 kVRongxin Steel 145 MW gas-fired plant
SZ20-150000/110110 kVGuohua Taizhou Hailing 95 MW fishery-solar project
SZ22-25000/110110 kVLeapmotor parts-plant 110 kV user substation
SFZ11-100000/3535 kVHubei Jinshenglan metallurgy substation
S20-20000/3535 kVZhangjiagang bonded-zone Changyuan thermal plant

Liye's product pages are organised by voltage class. Each entry is a model designation paired with the project it was built for; the pages print no losses, impedance or test values. Under the usual Chinese designation, the number before the slash is the rated capacity in kVA and the number after it the HV voltage class in kV. The table shows a selection of entries from each category as published on 30 October 2026.

Use these entries to ask whether Liye has built a comparable unit, not as a rating guarantee. For a new main transformer, supply the voltage combination, winding count and ratings, vector group, regulation and cooling, and ask for impedance and losses under the agreed duty and temperature. A model shown with a project name does not replace the selected design's guarantee sheet and test plan.

References: [2] [5] [6] [7]

03

Third-party tests the company history lists

Liye's development timeline names the designs it sent for external testing. These are the company's own statements; the test reports themselves are not published.

Scroll sideways to compare all columns.

YearDesignTest body as namedShort-circuit test stated
2004SFSZ11-M-30000/132KEMAYes
2013SFSZ11-180000/220National Transformer Quality Supervision and Inspection CentreYes
2017SSZ11-240000/220National Electrical Products Quality Supervision and Inspection CentreYes
2018ODFS-400000/500National Transformer Quality Supervision and Inspection CentreNot stated
2019SZ11-50000/110ASTA (witnessed test)Not stated
2024ODFS22-334000/500-NX1National Transformer Quality Inspection and Testing CentreYes

A 2022 English news item adds that an SSZ22-240000/220 unit, 230±8×1.25%/121/38.5 kV with 14–24–8% impedance, passed a short-circuit withstand test at what Liye calls the Suzhou Electric Science Research Institute.

Liye also says its own laboratory gained CNAS accreditation in 2021 and can perform every transformer test except the short-circuit test. Its About page lists ISO quality, environmental and health-and-safety systems, PCCC energy certification and KEMA, ASTA, DEKRA and CE certification, but the certificate images on its honours page did not load, so no certificate number, scope or expiry could be checked. Ask for the report of the specific design you are buying and for the current certificates.

Liye's own pages also differ on capacity: the About text gives more than 50 million kVA a year, the home-page counter 80 million kVA. The About page says Liye has built units up to 800 kV, while the 2011 timeline entry describes production capability for 750 kV and below.

References: [1] [8] [9]

04

Mobile and furnace references bring different engineering questions

The special-transformer page includes SFSZ20-50000/110 with a vehicle-mounted reference and HDSPZ-15000/25 with a Norwegian Elkem furnace-transformer label. It also lists a 30 MVA/132 kV Malaysia export reference dated 2006 and an SF-12500/67 Philippines entry dated June 2001. These are catalogue references with differing applications and, in some cases, explicitly historical dates.

A mobile-transformer inquiry needs the transport and operating configurations, mass limits, site connection arrangement and handling requirements. A furnace-transformer inquiry needs the connected process, expected duty and electrical interface. The same general power-transformer rating does not describe both applications adequately.

When asking about a comparable reference, identify the equipment role and relevant operating conditions. Request the proposed design's drawings and acceptance records instead of interpreting an older catalogue title as proof of current project completion or suitability for a new destination.

References: [3]

05

Maintenance and replacement deserve their own brief

The company's introduction includes operation, maintenance and repair in its service scope. A repair or replacement request should therefore start with the existing transformer's nameplate, drawings, service history, observed problem and any available test results. Identify whether the intended outcome is repair, life extension, replacement or a change in operating requirements.

For a replacement, provide foundation dimensions, terminal positions, protection interfaces, available access and the transport envelope. For a repair, define the requested diagnostic and repair boundary with the supplier before assuming that the equipment will return with a changed rating or a new guarantee. These are procurement recommendations appropriate to Liye's published service route, rather than commitments inferred from its general introduction.

Keep the outage, handling, on-site/off-site work and commissioning responsibilities separate in the commercial scope. Request the proposed inspection/test plan and the documents that will establish completion of the work.

References: [1]

06

A dated installation, repair and testing permission record

A National Energy Administration Jiangsu office notice, dated 2 April 2024 and numbered [2024]12, lists 南京立业电力变压器有限公司 at entry 4. It records permission for Class IV installation, repair and testing of electrical facilities under the notified-commitment procedure. The original notice is retained for this review.

This record concerns the dated electrical-facility permission described in that notice. It is not a nuclear manufacturing licence or a type-test certificate for a transformer. For a service contract requiring a specific current licence, obtain the current certificate, scope and status applicable to the work and location.

Liye's own introduction also discusses laboratory capability. For the order, request the actual scope and test arrangements. Routine testing, an accredited laboratory's scope and a short-circuit type-test report are separate evidence items and should be identified individually in the supplier's return.

References: [4] [1]

07

Get the drawings, test boundary and delivery arrangement together

For a new unit, require rating, voltage combination, frequency, winding material, vector group, regulation and cooling together with complete losses and impedance guarantees. For service work, add the existing-equipment records and the agreed repair/replacement boundary. Use the same specification revision across the data sheet, quotation and approved drawing.

For large equipment, ask for shipping dimensions/mass, any separately transported accessories, destination assembly, liquid handling where applicable and commissioning responsibilities. Define inspection/witness points, shipment documentation and serial-numbered reports. These details are particularly important when comparing a complete main-transformer offer with a service or replacement proposal.

The platform inquiry keeps the project requirements attached to the chosen supplier. The manufacturer’s published voltage tiers and special references help frame the request, while the supplier's model-specific technical return establishes what can actually be purchased.

A project brief the factory can respond to

Use this list to prepare your requirements. Checking an item only marks your preparation on this page.

0 of 6 items prepared

Prepare an RFQ for NANJING LIYE

Questions buyers ask

Which date belongs to the transformer business?

The company describes its transformer history as beginning in 1970 and acquisition/reorganisation in 2004. Its group's 1995 founding is a separate milestone.

Are the displayed project/model entries present quotations?

No. They are manufacturer-published references. Request a current technical and commercial proposal for the required duty and destination.

Does the 2024 energy-office notice certify a transformer model?

No. It records dated electrical-facility installation, repair and testing permission. Confirm the current scope for any service contract separately.

What should I send for a replacement or repair?

Include the existing nameplate, drawings, operating history, test results, installation interfaces and the requested work boundary.

Which external tests has Liye reported?

Its timeline lists KEMA (2004), the national transformer test centre (2013, 2018, 2024), the national electrical-products test centre (2017) and an ASTA witnessed test (2019) for named designs. Ask for the report of the design you are buying; the reports are not published.

Sources

9 sources · checked 30 October 2026

Prepared by PowerTransformerB2B. Checked 30 October 2026. The sources below identify the published company information and any dated public records used for this profile.

Company catalogues describe product families and options. Before you order, ask the manufacturer for the type-test report and acceptance documents for your exact model and rating.

  1. [1] Company identity, history and service scopeNanjing Liye · Manufacturer original
  2. [2] Main-transformer model/reference displayNanjing Liye · Manufacturer original
  3. [3] Special-transformer catalogue referencesNanjing Liye · Manufacturer original
  4. [4] NEA Jiangsu[2024]12 permission noticeNEA Jiangsu office · Government original archive
  5. [5] 500 kV and 330 kV product categoriesNanjing Liye · Manufacturer original
  6. [6] 220 kV product categoryNanjing Liye · Manufacturer original
  7. [7] 110 kV and 35 kV product categoriesNanjing Liye · Manufacturer original
  8. [8] Development timeline (发展历程)Nanjing Liye · Manufacturer original
  9. [9] English news: 240 MVA short-circuit testNanjing Liye · Manufacturer original