Request a quotation
← Manufacturer directory
Changzhou XD Transformer Co., Ltd. logo

MANUFACTURER PROFILE

Changzhou XD Transformer Co., Ltd.

AC ultra-high-voltage, DC converter and specialist transmission equipment, with a documented 2026 flexible-DC dispatch.

Discuss your project

Changzhou XD publishes a transmission-equipment portfolio spanning AC power transformers, DC converter transformers, reactors and specialist equipment. Its company introduction identifies the predecessor as Changzhou Transformer Factory, founded in 1958. The subsidiary's contact page gives No. 130 Yunhe Road, Zhonglou District, Changzhou. For buyers, its sourcing context is large transmission and converter-station equipment; the electrical system, converter arrangement and transport envelope should lead the inquiry.

Chinese entity
常州西电变压器有限责任公司
Subsidiary contact address
No. 130 Yunhe Road, Zhonglou District, Changzhou
Company-described predecessor
Changzhou Transformer Factory; 1958
Electrical roles
AC UHV, DC converter, reactors and specialist transmission
Dated dispatch
750 MVA flexible-DC unit; 6 March 2026
01

AC and DC ranges describe different electrical roles

Scroll sideways to compare all columns.

Published routeInformation to establish first
AC main or autotransformerWinding voltages/ratings, system requirements and regulation
DC converter transformerDC project designation, converter arrangement and AC winding schedule
Flexible-DC equipmentProject converter interface and the selected design's duty conditions
Reactor or reactive-power equipmentNetwork role and required electrical duty
20 Hz low-frequency routeFrequency, connected system and project-specific interfaces

The company's introduction describes AC transformers at 35–1,000 kV and DC product routes associated with ±50–±1,100 kV systems. It also lists 110–330 kV rectifier transformers, mobile transformers and reactors. The DC system designation must be kept separate from a transformer's AC winding-voltage schedule.

Its product navigation further distinguishes ultra-high-voltage equipment, high/extra-high-voltage transmission, special transmission, reactive-power compensation, generation support, 20 Hz flexible low-frequency transmission and industrial power supplies. These categories help define the intended role before comparing a model.

A purchaser should return to the project single-line diagram and technical specification for each route. A headline voltage limit is useful portfolio context, but cannot substitute for winding ratings, insulation requirements or a converter-station interface drawing.

References: [1] [2]

02

The product page names equipment and project pairings

Changzhou XD's product page identifies ODFPS-1000000/1000 for the Jindongnan–Nanyang–Jingmen AC project and ZZDFPZ-587100/500-1100 for the Changji–Guquan DC project. It also lists ZRDFP-750000/500-400 for flexible-DC duty. These are manufacturer-published model/project pairings, with the AC and DC contexts explicitly different.

For a comparable inquiry, state the equipment role and project conditions, then request the proposed model's full winding schedule, drawing and acceptance requirements. The model strings are not used here to derive unstated winding voltages, impedance or losses. Those values need the exact technical schedule for the offered equipment.

Reference projects can help structure a supplier discussion, especially for converter equipment. Ask which parts of a cited design are relevant to the new converter arrangement, environment and installation, and which need project-specific engineering.

References: [2]

03

March 2026: a 750 MVA flexible-DC unit dispatched

A Changzhou government-site report published on 14 March 2026 records dispatch on 6 March of a 750 MVA flexible-DC transformer for the Yuezhou station of the Gansu–Zhejiang ±800 kV project. It reports a dispatched unit mass of 395 tonnes and describes route planning for the shipment.

That is a dated dispatch record. The report's later delivery expectations are not treated as proof that all equipment was delivered or that the project had entered operation. For a new order, require its own manufacturing, testing, shipment and commissioning milestones.

The physical scale makes transport part of the procurement brief from the beginning. Provide the destination transport route constraints, lifting/handling requirements and site access. Ask the supplier to define the shipping configuration and responsibility for route studies, permits and site assembly, rather than settle those interfaces after manufacturing.

Recorded equipment
750 MVA flexible-DC transformer
Recorded destination
Yuezhou station, Gansu–Zhejiang ±800 kV project
Stage/date
Dispatch; 6 March 2026
Reported shipping mass
395 tonnes; not a generic catalogue unit mass

References: [3]

04

Production and logistics are linked at this factory

The company's introduction describes dust-controlled UHV/EHV production areas, a tank-manufacturing workshop, large lifting equipment and dedicated rail/water transport arrangements. These are manufacturer descriptions of its manufacturing and logistics facilities, not capacity guarantees for a new order.

For large equipment, request the production and inspection sequence that applies to the selected unit: active-part work, tank/interface completion, test arrangements, shipping preparation and destination assembly. Establish the design-specific witness points and records required by the purchaser. A general facility description becomes useful only when connected to the actual order's quality plan.

The contact page lists repair and user-service functions separately from sales. If a project includes repair or replacement of existing equipment, define that scope with its existing drawings and operating records rather than assume it is included in a new-unit quotation.

References: [1] [4]

05

Converter, low-frequency and industrial briefs need their own conditions

For converter duty, provide the converter-side arrangement, operating conditions and system interfaces specified by the project engineer. For a low-frequency application, explicitly state frequency and duty rather than carry over a normal-frequency transformer schedule. For industrial rectifier equipment, provide the connected process and expected operating cycle.

These are distinct inquiry requirements supported by the company's published product categories. They are not claims that one catalogue design can be used unchanged across those applications. Ask for a technical return identifying the proposed winding arrangement, cooling, insulation, impedance and guaranteed losses under the actual duty.

Keep reactor requirements separate from transformer requirements where a procurement includes both. Define each equipment item's network role and acceptance conditions so the supplier's package schedule can be evaluated line by line.

References: [2]

06

Keep subsidiary identity, guarantees and acceptance aligned

The legal name is 常州西电变压器有限责任公司. Its Changzhou contact address should be used as the subsidiary location reference; the group's Xi'an footer is a separate corporate contact. Confirm the contracting details on the supplier's commercial documents.

For the selected equipment, require the drawing revision, complete winding/rating schedule, materials, cooling, losses and impedance with their conditions and tolerances. Identify applicable standards/editions and distinguish existing relevant type-test evidence from routine tests performed on the delivered unit.

Align drawing approval, factory witness points, shipment documentation, site assembly and commissioning in the commercial schedule. For very large equipment, include accessories shipped separately and the tests required after installation. This connects Changzhou XD's published transmission expertise to a concrete order while preserving the difference between a reference, a dispatch and actual project acceptance.

References: [4]

A project brief the factory can respond to

Use this list to prepare your requirements. Checking an item only marks your preparation on this page.

0 of 6 items prepared

Prepare an RFQ for CHANGZHOU XD

Questions buyers ask

Is a DC system designation an AC winding rating?

No. State the DC project and converter arrangement separately from the full AC winding voltage/rating schedule.

Does the March2026 report establish commissioning?

No. It records dispatch. Delivery, installation and commissioning are separate milestones.

What is essential for a large-transformer inquiry?

Provide the electrical specification together with transport/access constraints, handling arrangements, site assembly and required acceptance documents.

Which address belongs to the subsidiary?

The company contact page gives No.130 Yunhe Road, Zhonglou District, Changzhou. The shared group's Xi'an footer is a separate corporate contact.

Sources

4 sources · checked 8 October 2026

Prepared by PowerTransformerB2B. Checked 8 October 2026. The sources below identify the published company information and any dated public records used for this profile.

Company catalogues describe product families and options. Before you order, ask the manufacturer for the type-test report and acceptance documents for your exact model and rating.

  1. [1] Subsidiary company introduction, history and facilitiesChangzhou XD · Manufacturer original
  2. [2] Transmission equipment and model/project entriesChangzhou XD · Manufacturer original
  3. [3] 750 MVA flexible-DC dispatch report, 14 March 2026Changzhou government website / local news media centre · Dated original reporting
  4. [4] Subsidiary Changzhou contact and service functionsChangzhou XD · Manufacturer original